This is the full-section work the case study on the home page is built on. Stripping back top soil from three sides of a house. Pulling a fish pond, a foot path, a hillside. Bringing the section down level to the house so the next trade can build off it.
Most section reshape work falls into one of three jobs: cut for a new house pad, drop a hillside that is encroaching on an existing house, or level a paddock down to a useable platform. The 1.8 tonne does all three, just on a smaller bite each time.
Most reshape jobs involve a hedge, a tree or two, and a few stumps that need pulling. The bucket-and-ripper combo handles small stumps directly. Larger ones get a chainsaw on the trunk first and the digger on the roots after. Vegetation is pushed into a pile for the client to burn or get carted off.
Build-ready. Level enough that the builder string-line tells him the truth. Clean enough that you can walk it without rolling an ankle. Spoil either gone or stockpiled where you wanted it. No 12-tonne track ruts across the lawn on the way out.